Spring
02
|
|
| Organizational Discussion |
|
|
|
Fall 02
|
|
| Convene Steering Committee |
|
| Review
WASC Standards |
|
| Review the format &
required elements of proposal |
|
| Review
and make recommendations on the mission statement |
|
| Produce draft of the
Context |
|
| Review
the strengths and weaknesses of 8 strategic planning themes |
|
| Choose topics for teaching
effectiveness review |
|
| Construct
a work plan and timeline |
|
| Construct communication
plan |
|
| Review
WASC recommendations from 1997 review |
|
|
|
Spring 03
|
|
| Meet with PHRED (President's Staff) about Student Support Programs (Linda Buckley: 2/3/2003) |
| WASC/AAHE
Workshop (Carson, CA: 2/5/03 - 2/7/2003) |
|
| Produce
draft of Position Paper for Institutional Proposal (2/11/2003) |
|
| Meet with Curriculum Policy Committee (CPC) to review and make recommendations on Academic Program Theme (2/20/2003) |
|
| Present Position Paper to CUP Planning Committee (2/24/2003) |
|
| Meet with CUP to present Position Paper for the review (2/28/2003)
|
|
| Meet with CUP to ask for recommendation to be sent to the President (3/14/2003) |
|
|
|
Fall
03 |
|
| Reconvene
the WASC Planning Group: 09/03 |
| Beginning
a revision of Mission Statement: 09/03 |
|
| Survey 10
Sacramento State Constituency groups for feedback: 10/03 |
|
| Collect
and aggregate data on Mission Statement: 11/03 |
|
| Draft
Mission Statement: 11/03 |
|
| Begin
work on new strategic planning model: 11/03-12/03 |
|
|
|
|
Spring
04 |
|
| Present
Draft Mission Statement to President: 01/04 |
| Present
tentative strategic planning model to the President: 01/04 |
|
| Begin
to work with CUP on integrating new strategic planning
model: 02/04 |
|
| Convene
Phase II Working Group: 02/04 |
|
|
|
|
|
Fall 04 (Tenative)
|
|
| Circulate Proposal for
Consensus Building and Feedback Per communications plan |
|
|
|